SYSN Integral High-Pressure Cementing Head Wellhead Tool
SYSN Integral High-Pressure Cementing Head Wellhead Tool
Description
SYSN Integral High-Pressure Cementing Head Wellhead Tool
The cement head is an essential and critical wellhead tool used in various oil and gas well cementing operations. luben@youlongpetro.com Whatsapp+8615972752793 During cementing, it connects the external manifold and casing, sequentially completes all construction procedures, quickly releases the plug, and ensures safe and smooth cementing operations.
Common Specifications and Technical Parameters Table
| No. | Product | specification | ID
mm |
Max WorkingPressure psi | Number of Plug |
| 1 | Integral High-Pressure Cement | 51/2″ | 146 | 15000 | Single\Double |
| 2 | Integral High-Pressure Cement | 7″ | 183 | 15000 | Single\Double |
| 3 | Integral High-Pressure Cement | 95/8″ | 249 | 10000 | Single\Double |
| 4 | Integral High-Pressure Cement | 133/8″ | 345 | 10000 | Single\Double |
Technical Feature
➢ Molded as a single piece with no welding, ensuring safety and reliability.
➢ Made of high-strength alloy steel, luben@youlongpetro.com Whatsapp+8615972752793 offering high pressure resistance and excellent wear resistance.
➢ Internal balance design, balancing the pressure on the top and bottom of the plug;
➢ External high-pressure manifold,facilitating construction;
➢ The bottom is designed for quick assembly, luben@youlongpetro.com Whatsapp+8615972752793 suitable for various types of casings;
➢ Equipped with a plug indicator and a pressure sensor.
Applied Range
➢ It is used for cementing operations in various oil and gas wells, luben@youlongpetro.com Whatsapp+8615972752793 gas storage reservoir wells, etc., and is particularly suitable for operations in ultra-deep wells and high-pressure wells.
➢ Working Pressure: 5000 psi ~ 15000 psi; www.youlongpetro.com The specifications range from 4 1/2″ to 20″.











